1. Site Work
  2. Parking and Sidewalks

Faith Reformed Church Sidewalk Restoration

Concrete surfaces at Faith Reformed Church were damaged from applying ice-melt products in the winter months. HBHansen's site-work crew removed approximately 100' of existing concrete and prepared the site for new concrete. Completed May 2009.
Read More
faith reformed May 2009 001
1 / 12

faith reformed May 2009 001

faithreformedmay2009001

  • faith reformed May 2009 001
  • faith reformed May 2009 005
  • faith reformed May 2009 004
  • faith reformed May 2009 002
  • faith reformed May 2009 003
  • Old concrete now fully removed
  • Stairs to remain....new sidewalks to be installed
  • HBHansen crews loading broken concrete pieces
  • Removing old concrete
  • Sidewalk removed....jobsite marked off for safety
  • Existing Conditions, damaged concrete to be replaced
  • Damaged concrete ramp at Faith Reformed Church
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2022 SmugMug, Inc.